The company Ltd. “Talos Construction” has implemented an installation of engineering systems (internal and external), supply of equipment, and commissioning works.
High – class specialists of “Talos Construction” have delivered the facility for an operation and to the agency of construction supervision in record time (June 2016 – November 2016).
The Performed works:- Heating - heat supply
- General ventilation
- Air conditioning
- Thermal stations
- Systems of internal water supply
- Systems of internal water removal