RESIDENTIAL COMPLEX ACTION 1905GODA

Moscow, 1st Zemelnyi lane 7/2

EMPLOYER:

HORTEX

OPERATIONS AREA:

39.217 sq.m

The under construction business center from class A comes along with modern architecture and advanced engineering systems. The facility is located in close proximity to the center of Moscow, between the Garden Ring and the Third Transport Ring. The convenient location allows to get to the business center in a short time from any district of Moscow.

  • The overground part of the residential complex includes 3 floors of 12.827 sq.m., underground part includes 15 floors of 26.390 sq.m., Offices are located at 18.473 sq.m., Hotels are located at 7917 sq. M.

  • The Project “Action Development » has parking lots for 370 cars.

The business center will have a developed internal infrastructure: restaurants and cafes will be located on the first floors, a congress center will be located with rooms for various events (conferences, negotiations, banquets).

The ceiling height is 3.3 m. The facades are made of natural stone using glass and wood.

The specialists of Ltd. “Talos Construction” have begun to design and implement engineering systems (internal and external) and electrical systems, which is subject to subsequent service. Talos implements the complete supply of equipment, commissioning and launching of the systems and to the Rostekhnadzor authorities.

The Performed works:


Mechanical Systems

  • Heating and Ventilation

  • Plumbing and Sewerage

  • Cooling and air conditioning

  • ETC

  • Refrigeration center

  • Fire extinguishing systems

  • Technological equipment and pipelines

  • Fuel supply and gas exhaust system

  • DGU Automation

  • Electrical Systems

  • Low –current system

Elecrical Systems

  • Power supply and electric lighting

  • Outdoor Lighting

  • Lightning and grounding

Low Current Systems

  • Radio system

  • Fire alarm system

  • Gas automatic fire extinguishing system

  • Evacuation Alert and Control System

  • Access Control and Management System

  • CCTV

  • Automation of general ventilation

  • Automation of cooling systems

  • Automation of power supply systems

  • Automation of installation of water fire extinguishing

  • Fire Automation

  • Automation of water supply and drainage systems

  • Safety system